11. Explain the visualizing progress in detail with practical example.

5 marks | Asked in 2076

answered by anonymous


A manager needs some way of presenting that data to greatest effect. Some methods of presenting picture are, Gantt chart – tracking project progress .It is the simple and the oldest form of representing the progress of the project. It consists of activity bar that indicates the scheduled activity dates and the duration along with the activity floats. Slip chart – visual indication of activities that are not progressing to schedule. Alternative view of Gantt chart by providing a visual indication of those activities which are not on schedule. The more bend in the greater the variation in the project plan. If the slip line deviates more towards the non achievement of project objectives then it has to be reconsidered. Additional slip lines can be included at regular intervals. Ball charts – way of showing or not targets have been met or not. It is represented in the form of circles that indicate the start and the end point completion of activities. Circles of the ball chart mostly contain only two dates the original and the revised one. An activity is denoted by a red circle and green color denotes that the activity is ahead of its schedule. Slippage in the project completion date but it is overcome by the timeline charts TimeLine: The timeline is a method of recording and displaying the way in which targets have changed throughout the duration of the project.