Real Time Systems - Old Questions

7. How frame overruns are handled in cyclic Scheduling? Calculate the possible valid frame size for system with tasks T1(2, 1, 3),T2(4 , 1, 6), T3(6, 2, 8) and T4(6, 2, 8).

8 marks | Asked in 2074