Real Time Systems - Old Questions
Question Answer Details
8. List the assumptions made for priority driven scheduling. Construct the LST schedule for a system with tasks T1(2,0.5), T2(3,1) and T3(6,2).
Answer
AI Generated Answer
AI is thinking...